歡迎本藍環保!本公司主營:吸收塔、pp酸霧吸收塔、pp凈化吸收塔、pp噴淋廢氣凈化塔,歡迎咨詢!

本藍環保

吸收塔廠家
為環保發展保駕護航

全國咨詢熱線 131053032350530-8586555
當前位置:凈化塔_不銹鋼酸洗塔價格_pp酸霧凈化塔廠家_酸霧處理塔 > 公司動態 > 公司新聞 >

酸霧凈化塔制作方法配方

作者:admin 來源:未知點擊數:197發表時間2019-12-16 16:10

酸霧凈化塔制作方法配方
Preparation method and formula of acid mist purification tower
①配制方法:按生產條件流水作業進行配制,在搪瓷能內放入100千克樹脂,再加入4千克氧化環已酮糊,攪拌均勻,再加入鈦青綠色漿糊適量,目觀顏色達到所需要求即可,放置備用。
① preparation method: prepare according to the production conditions, put 100 kg of resin in the enamel energy, then add 4 kg of cyclohexanone oxide paste, mix evenly, then add a proper amount of titanium cyan green paste, the visual color can meet the requirements, and put it for standby.
凈化塔進程氣體的正確挑選
凈化塔
Correct selection of process gas in purification tower
②制作方法:將聚酯薄膜裁成2.1米長,寬約1.1米的操作平臺上,鋪放一層聚酯薄膜,在薄膜上鋪好一層方格布,再在方格布上鋪一層方格布,再在上面鋪薄膜,再鋪二層方格布在鋪薄膜。如此重復鋪放許多層,當鋪好后,再進行手糊操作生產,用搪瓷把缸從搪瓷桶中取出配有氧化環已酮和色漿的樹脂(0.8—1千克)倒入另一搪瓷小盆中,再加入樹脂重量的47%環烷酸鈷溶液,攪拌均勻,然后倒在鋪好的上層方格面上,用一個大刮板將樹脂迅速均勻展開。另取1張聚酯薄膜蓋在上面,換一個小刮板在聚酯薄上面刮除夾在方格布中的氣泡。當方格布全部被樹脂液浸漬,氣泡全部趕除后,將夾有方格布的上層薄膜一起移放到在一波型金屬模具上或其它材質的波型正模具上,凈化塔待固化即成一張綠色玻璃鋼凈化塔波紋瓦板,再重復上述操作即能得到若干張玻型瓦,每一模具瓦可疊放許多層新做的瓦,然后鋸邊修整即可出售。
② production method: cut the polyester film into a 2.1-meter-long and 1.1-meter-wide operation platform, lay a layer of polyester film, lay a layer of checkerboard on the film, then lay a layer of checkerboard on the checkerboard, then lay the film on it, and then lay two layers of checkerboard on the film. So many layers are laid repeatedly. After laying, the hand paste operation is carried out. The resin (0.8-1kg) equipped with cyclohexanone oxide and color paste is taken out from the enamel barrel and poured into another enamel small basin. Then 47% of the weight of the resin is added into the solution of cobalt naphthenate, stirred evenly, poured on the paved upper grid, and quickly and evenly expanded with a large scraper 。 Take another sheet of polyester film and cover it. Change a small scraper to scrape off the bubbles in the checkerboard on the polyester film. When the checkerboard cloth is all impregnated with the resin solution and the bubbles are all removed, the upper layer film sandwiched with a grid cloth is moved to a wave mold or other material positive wave mold. The purification tower is solidified into a green corrugated glass tile column of the purification tower. After repeated operation, a number of glass tiles can be obtained, and each tile can be stacked with many new layers of tiles. Then saw trim can be sold.
③注意事項:
③ precautions:
Purification tower
a、每張瓦所用樹脂較少時,除用刮板在上層薄膜上展開樹脂和驅氣泡外,還須翻面(將上面翻到鍍層)然后進行一步展開樹脂和驅除氣泡。
A. when less resin is used for each tile, in addition to using scraper to expand resin and drive bubbles on the upper film, it is also necessary to turn over (turn over the upper layer to the coating) and then carry out one-step resin development and drive bubbles.
b、刮法展開和驅氣泡時,應用樹脂將方格布全部浸透,氣泡要全部除盡顏色均勻。
B. when the scraping method is used to develop and drive bubbles, resin shall be used to fully soak the checkerboard, and all bubbles shall be removed with uniform color.
c、促進劑鈷液加入量,視氣溫而定,夏天氣溫高則少加(例如加17%)氣溫低多加(例如4%)氣溫低于15度則固化較困難。
C. The amount of accelerant cobalt solution added depends on the temperature. If the temperature is high in summer, it will be less added (for example, 17%), if the temperature is low, it will be more difficult to add (for example, 4%) if the temperature is lower than 15 ℃.